• Daytona Beach Westside WWTF Generator Installation

    The City of Daytona Beach contracted with TLC Diversified for the installation of a new 2,500kW Emergency Back-up Generator at their Westside Regional WWTP

Owner
Daytona Beach
Engineer
Carollo
Generator Size
2,500kW
Lost Time Incidents
0
Fuel Capacity
19,000 gallons

Project Details

This project involved the installation of a new owner supplied 2,500 kW Tier 4F diesel emergency generator at the City’s treatment plant. We provided a 75’ x 34’ concrete slab-on-grade to support the generator along with the generator’s building enclosure and 19,000-gallon belly tank. This project also involved new switchgear, new ATS, new control panel for generator, two new 750 gallon DEF tanks and all supply piping, new asphalt driveway to generator facility, electrical upgrades, temporary generator during shut-down period and we also provided modifications to the existing electrical building which included HVAC, masonry walls, and painting.