• Iron Bridge RWRF Master Pump Station Odor Control Improvements

    Installation of a new 10,000 cfm odor control system consisting of two Biotrickling Filter units for controlling odorous gases from an existing wet well.

Owner
City of Orlando
Engineer
CDM Smith
Contract Amount
$896,470.00
Lost Time Incidents
0
Odor Control
Biotrickling Filter System

Project Details

Installation of a new 10,000 cfm odor control system consisting of two Biotrickling Filter units for controlling odorous gases from an existing wet well. The project scope of work included importing and placing approximately 600 cubic yards of clean fill, concrete equipment slab, HDPE duct work, electrical and instrumentation upgrades.