• Orange County NWRF Watermain Extension & Pump Station Upgrades

    TLC installed close to 4,000 feet of 24″ ductile iron restrained joint pipe and five 124 horsepower vertical turbine pumps for the distribution of effluent reuse coming from the Northwest treatment facility in Orange County.

Owner
Orange County
Engineer
CPH
Contract Amount
$1,703,130
Total Pipe Buried
3,840
Pumps
Vertical Turbine (5)

Project Details

Project involved the clearing of 4 acres of thick foliage and then installation of 3,800 lineal feet of 24” ductile iron buried piping along with a 24” above ground flowmeter manifold. We furnished and installed new pipe, valves, fittings and five (5) new 125HP vertical turbine pumps at the plant master distribution pump station. Also included were electrical and instrumentation upgrades.