• Pasco County Beneficial Water Reuse Project

    We are proud to have partnered with Phillips & Jordan on this project for Pasco County. TLC worked as a sub-contractor alongside P&J. We don’t work often a sub-contractor but when we do we work with only the best.

Owner
Pasco County
Engineer
CH2M
Pipe Length
11,300
Pipe Size/Type
24" & 8" PVC/DIP
Lost Time Incidents
0

Project Details

Project involved the installation of a 36” x 24” wet tap onto Pasco County’s existing reclaim water main. From there we self-performed the installation of 3,900 lineal feet of 24” restrained-joint ductile iron piping to an above ground valve header manifold plus another 7,400 lineal feet of 8″ C-900 PVC distribution piping to four percolation ponds. TLC carried the electrical portion of the work along with 80’ x 15’ concrete slab at the header manifold.