Location
Bradenton, FL
Client Type
Municipal
Project Type
Pump Station
Value
$15 Million
Delivery Method
Design – Bid – Build
PROJECT SUMMARY
Manatee County Reclaim Water Pump Back Station
This project scope involved the construction of a poured-in-place reclaimed pump back station with an overall depth of 40 feet. We utilized a tight-sheeted cofferdam for shoring; supply and installation of three new 125 HP submersible pumps; 5,000 lineal feet of 24” & 36” lake intake piping (open cut), 560 feet of 36” Permalok steel pipe installed via microtunnel method w/ wet recovery of the MTBM; reshaping and grading of 9,000 lineal feet of existing berm at the water retention pond; importation, placement and compaction of 80,000 yards of fill; installation of two new lake intake screens; implementation of ARC flash improvements at existing plant.