Location
Wildwood, FL
Client Type
Municipal
Project Type
Water Storage, Pump Station, Water Treatment Plant
Value
$7.5 Million
Delivery Method
Design – Bid – Build
PROJECT SUMMARY
Wildwood Oxford Water Treatment Plant
This project consisted of the construction of a 2.35 MGD water treatment facility. The treatment plant consists of two Lower Floridan Aquifer well pumps, one pH adjustment system, two packed tower aeration systems, two odor control systems, one 1,000,000-gallon ground storage tank, a high service pump station housed in a masonry building, disinfection system, a chlorine analyzer, a back-up generator, 6,000 feet of 12”, 16”, and 20” site piping with associated fittings, SCADA system, site fencing, a camera security system and an access driveway.