Location
Winter Garden, FL
Client Type
Municipal
Project Type
Water Storage, Pump Station
Value
$8.0 Million
Delivery Method
Design – Bid – Build
PROJECT SUMMARY
Winter Garden Storage & Pumping Facility
This project consisted of the construction of a remote storage and pumping facility located within the City of Winter Garden and served the City’s potable water and public access reuse systems. The new facilities included construction of a 2-MG and 1-MG prestressed reinforced concrete ground storage tanks, a high service pump station, an electrical room, generator and fuel system, and chemical storage and feed systems housed in a concrete masonry building.
The project also included 16” potable water and 20” reclaimed water transmission pipelines from the new facility to the intersection of Williams Road and Amber Sweet Lane, and a 16” metered connection with the Water Conserv II reclaimed water distribution system. A new access roadway with asphalt pavement and stormwater system was constructed from the main road and onto the new facility site.